Quotation
Q-25-0151
Issued 22 Dec 2025
Valid until 20 Feb 2026
Lead time 16 weeks
Prepared for
Unilever Australia
Attn: Rajesh Iyer, Automation Lead
145 Airds Road, Minto NSW
ABN 92 827 842 646
145 Airds Road, Minto NSW
ABN 92 827 842 646
Scope
Pallet destrapping / debanding — Line 2
Pallet destrapping / debanding · Robot: ABB IRB 460
Site: Unilever Australia — Minto
Site: Unilever Australia — Minto
| # | Description | Qty | Unit ex GST | Amount ex GST |
|---|---|---|---|---|
| 1 | Mechanical design & functional specification | 1 | $52,640.00 | $52,640.00 |
| 2 | ABB IRB 460 robot package incl. controller | 1 | $103,488.00 | $103,488.00 |
| 3 | Pallet destrapping / debanding — manufactured and assembled | 1 | $97,202.00 | $97,202.00 |
| 4 | Controls design, PLC & robot programming | 1 | $39,480.00 | $39,480.00 |
| 5 | Factory acceptance test (FAT) at Ferntree Gully | 1 | $13,160.00 | $13,160.00 |
| 6 | Installation, site acceptance & commissioning | 1 | $23,030.00 | $23,030.00 |
| Subtotal ex GST | $329,000.00 | |||
| GST 10% | $32,900.00 | |||
| Total incl GST | $361,900.00 | |||
Progress claims
30% On order$98,700.00 ex GST
40% On FAT sign-off$131,600.00 ex GST
30% On commissioning$98,700.00 ex GST
Payment terms: 45 days EOM. All prices in AUD.
Notes
FAT at Trak Automation, Ferntree Gully, before dispatch. Commissioning on site by Trak field service.
Robot and guarding to AS/NZS 4024. Delivery ex works unless stated.
Aiden Clarke
Sales Engineer — Zimmer & spares · +61 3 8684 9132 · aiden@trakautomation.com
Margin · internal
$97,45529.6%
Engineering$92,120 · 44%
Third-party$103,488 · 11%
Hardware$97,202 · 33%
Labour$13,160 · 40%
Install$23,030 · 38%
Linked
- Customer
- Unilever Australia
- Contact
- Rajesh Iyer
- Enquiry
- —
- Project
- —
- Owner
- Aiden Clarke
Went with integrator's in-house tooling.
Emails
Not sent yet.
Activity
Invoice INV-10467 raised — Deposit 30% — synced to Xero.
18 Sep, 4:01pm · KL
Quote Q-26-0060 won — project TA-26-042 opened.
18 Sep, 10:57am · CK
Quote Q-26-0098 sent — Vacuum palletising gripper — mixed SKU end of line.
10 Sep, 3:50pm · CK
Quote Q-26-0060 sent — Robot machine loading — carton blanks into case erectors.
13 Aug, 3:46pm · CK
Quote Q-26-0092 sent — Machine loading — Line 1 upgrade.
27 Jul, 3:06pm · CK
Quote Q-25-0151 lost. Went with integrator's in-house tooling.
17 Jan, 10:45am · AC
Quote Q-25-0151 sent — Pallet destrapping / debanding — Line 2.