Trak
Trak
Quote Q-25-0151 Demo Unilever Australia
Xero · synced 9:14am Tue 06 Oct 2026
← Quotes Lost
Trak Automation
Trak Automation Pty Ltd — part of the Trak Group
Unit 2, 19 Cornhill Street, Ferntree Gully VIC 3156
+61 3 8684 9132 · sales@trakautomation.com · trakautomation.com
ABN 41 137 842 906
Quotation
Q-25-0151
Issued 22 Dec 2025
Valid until 20 Feb 2026
Lead time 16 weeks
Prepared for
Unilever Australia
Attn: Rajesh Iyer, Automation Lead
145 Airds Road, Minto NSW
ABN 92 827 842 646
Scope
Pallet destrapping / debanding — Line 2
Pallet destrapping / debanding · Robot: ABB IRB 460
Site: Unilever Australia — Minto
#DescriptionQtyUnit ex GSTAmount ex GST
1 Mechanical design & functional specification 1 $52,640.00 $52,640.00
2 ABB IRB 460 robot package incl. controller 1 $103,488.00 $103,488.00
3 Pallet destrapping / debanding — manufactured and assembled 1 $97,202.00 $97,202.00
4 Controls design, PLC & robot programming 1 $39,480.00 $39,480.00
5 Factory acceptance test (FAT) at Ferntree Gully 1 $13,160.00 $13,160.00
6 Installation, site acceptance & commissioning 1 $23,030.00 $23,030.00
Subtotal ex GST$329,000.00
GST 10%$32,900.00
Total incl GST$361,900.00
Progress claims
30% On order$98,700.00 ex GST
40% On FAT sign-off$131,600.00 ex GST
30% On commissioning$98,700.00 ex GST
Payment terms: 45 days EOM. All prices in AUD.
Notes
FAT at Trak Automation, Ferntree Gully, before dispatch. Commissioning on site by Trak field service. Robot and guarding to AS/NZS 4024. Delivery ex works unless stated.
Aiden Clarke
Sales Engineer — Zimmer & spares · +61 3 8684 9132 · aiden@trakautomation.com
Margin · internal
$97,45529.6%
Engineering$92,120 · 44%
Third-party$103,488 · 11%
Hardware$97,202 · 33%
Labour$13,160 · 40%
Install$23,030 · 38%
Linked
Customer
Unilever Australia
Contact
Rajesh Iyer
Enquiry
—
Project
—
Owner
Aiden Clarke

Went with integrator's in-house tooling.

Emails
Not sent yet.
Activity
Invoice INV-10467 raised — Deposit 30% — synced to Xero.
18 Sep, 4:01pm · KL
Quote Q-26-0060 won — project TA-26-042 opened.
18 Sep, 10:57am · CK
Quote Q-26-0098 sent — Vacuum palletising gripper — mixed SKU end of line.
10 Sep, 3:50pm · CK
Quote Q-26-0060 sent — Robot machine loading — carton blanks into case erectors.
13 Aug, 3:46pm · CK
Quote Q-26-0092 sent — Machine loading — Line 1 upgrade.
27 Jul, 3:06pm · CK
Quote Q-25-0151 lost. Went with integrator's in-house tooling.
17 Jan, 10:45am · AC
Quote Q-25-0151 sent — Pallet destrapping / debanding — Line 2.
22 Dec, 3:17pm · AC